PAGE | 18
3G FACADE AND FRAMING
RAYMOND
TERRACE
HEALTHONE
RAYMOND TERRACE
Replacement of non-compliant polyethylene core ACP, along with water ingress eradication and
other works including;
- Removal and Replacement of existing ACP utilising Vitracore G2
- CFC Replacement
- Controlled Disposal of Combustible Cladding
The project was carried out in stages in collaboration with the hospital, to allow them to maintain
operations with minimal disruptions throughout the length of the project.